In what order should the walls and roof of a sukkah be built, and how can the reverse order be corrected?
The walls are built first and the sechach is laid afterward; the text calls a sukkah invalid when its roof was ordinarily laid before its walls. To correct this after construction is complete, the roofing must be lifted slightly and lowered again so that it counts as newly laid. The text also allows laying sechach before the walls if its supporting beams are more than a handbreadth wide, approximately 8 cm.
A practical halachic question: the final ruling is for your rabbi.
Quote from the source«Кровля окажется как бы уложенной заново.»
- Author
- Редакция «Фонд Наследия»
- Source
- Fond Nasledia — offline 208 sukkot 2020, p. 14