What is required when separated production lines discharge water at nearby drainage points?
The institute requires that the water at the discharge point not be at yad soledet temperature; the article specifies a limit of 42°C. The water is first cooled in cooling tanks and only then allowed to overflow into the sewer.
A practical halachic question: the final ruling is for your rabbi.
Quote from the source«הדרך להשיג זאת היא באמצעות צינון המים במיכלי צינון, כשרק לאחר מכן הם יגלשו לביוב.»
- Author
- Редакция «אספקלריה»
- Source
- אספקלריה — אספקלריה — Terumah 5784, p. 31
- Parsha
- Terumah