Why did the Rebbe of Otwock insist on changing the deadline in a timber contract?
The contract required the buyer to remove all the timber by the end of winter or lose his payment. The Rebbe objected to accepting a condition that winter weather could make impossible to fulfill. In a letter to the seller, he described her intention as deception, connected it to her son’s illness, and demanded a five-year deadline; according to the account, the contract was replaced.
This answer was given to a specific person, not as a general rule.
Quote from the source«היא קרעה את החוזה הקודם, ושליחו של הרבי חתם מיד על החוזה החדש, ולחסיד באה הישועה.»
- Author
- הרב שמחה בונים קאליש מאוטבוצק
- Source
- פניני הצדיקים — פניני הצדיקים – שמות — Shemos 5784, p. 20
- Parsha
- Shemot