How was a Chabad mikva made possible where a water main ran beneath the building?
In Gan Yavneh, experts considered an additional reservoir impossible because a water main ran beneath the building, and everything was already ready for concrete pouring. The architect nevertheless took the religious council’s request to help Chabad seriously and found a solution: raise the building. The story shows that a willingness to seek a solution can reveal a possibility previously ruled out.
Quote from the source«You simply raise the building!»
- Author
- Rabbi Boaz Lerner
- Source
- Beis Moshiach - English — 481, p. 23